
TESCO HAMPTON
Drainage Connection
Project Statistics
- Started
- July 2026
- Completed
- July 2026
In July 2026, GKL were proud to return to Hampton for a small-scale job connecting foul drainage and water main to support a Dessert Pod next to the existing outside pods in Serpentine Green. This job was testament to GKL’s ability to work directly in the public eye, with all works being undertaken in front of a live shopping centre.
This job was a good demonstration of GKL’s ability to work at the small scale as well as the large, and give equal care and attention whatever the scale.